Floor Layers, Except Carpet, Wood, and Hard Tiles
Tasks
Core Tasks Include:
- Sweep, scrape, sand, or chip dirt and irregularities to clean base surfaces, correcting imperfections that may show through the covering.
- Cut flooring material to fit around obstructions.
- Inspect surface to be covered to ensure that it is firm and dry.
- Trim excess covering materials, tack edges, and join sections of covering material to form tight joint.
- Form a smooth foundation by stapling plywood or Masonite over the floor or by brushing waterproof compound onto surface and filling cracks with plaster, putty, or grout to seal pores.
- Measure and mark guidelines on surfaces or foundations, using chalk lines and dividers.
- Cut covering and foundation materials, according to blueprints and sketches.
- Roll and press sheet wall and floor covering into cement base to smooth and finish surface, using hand roller.
- Apply adhesive cement to floor or wall material to join and adhere foundation material.
- Determine traffic areas and decide location of seams.
- Lay out, position, and apply shock-absorbing, sound-deadening, or decorative coverings to floors, walls, and cabinets, following guidelines to keep courses straight and create designs.
- Remove excess cement to clean finished surface.
- Disconnect and remove appliances, light fixtures, and worn floor and wall covering from floors, walls, and cabinets.
Supplemental Tasks Include:
- Heat and soften floor covering materials to patch cracks or fit floor coverings around irregular surfaces, using blowtorch.
The data sources for the information displayed here include: O*NET™. (Using onet28)